Introduction

 

The product is an odorless, non-toxic, light cream paste for the horizontal joints of buildings and exposed surface aggregates. It is suitable for newly poured concrete surfaces and forms the mechanical properties required for the construction of joints, plasters and mortars. Bite connection. Instead of sandblasting, chiseling and other methods. The exposed aggregate is intact and buried tightly. Concrete vertical or flat surface suitable for Portland cement products

 

use


The combination of retarding ingredients in the product and the surface of cement retards hydration for 1 to 2 days. After retarding, the concrete can be completely cured to its original design strength.

 

Instructions 


1. It can be used after stirring in a bucket, but it cannot be diluted with water.

2. Use a brush or roller to apply a thicker layer on any kind of clean template. The amount is generally 0.3KG per square and allow it to air dry (approx. 2-4 hours).

3. When using a new wooden or porous template, it is usually at least two coats.

4. After repeated use of the template brush leftover concrete residue, the retarder should be re-brushed as soon as possible.

5. The template coated with slow drying agent can no longer be painted with any mold oil.

6. Prevent strong light.

7. The template should be removed as soon as possible after the completion of concrete construction. Generally, the temperature should not exceed 24 hours when the weather temperature is high, and it cannot exceed 48 hours when the temperature is low.


 

Packaging, storage 

1,50 kg/barrel

2, sealed storage, placed in dark storage. Temperature at +5 °C - +40 °C.

3, shelf life of 1 year


Copyright:GUANGZHOU B.D NEW BUILDING MATERIALS TECHNOLOGY CO.LTD 

Address: Room 1413, 14th floor, Dongjian building, 503 Dongfeng Middle Road, Yuexiu District, Guangzhou, Guangdong, China

Mr. Xie: 13332811747

Site: Changhong Ridge Phase II Industrial Park, Xingxian, Shishan Town, Foshan City

Guangzhou Website ConstructionJun domain website construction experts